Piegādes termiņš katrai precei ir norādīts pie cenas bloka.
Piegāde visā Latvijā: bez maksas.
Trumpai apie prekę
Prekė: Penalas Absolute Hooklength Long Leaders. Kategorija: Dėžės ir konteineriai.
- Gamintojas: Preston
- Modelis: Absolute Hooklength Boxes
- Spalva: silver
Preston Pencil Case for Absolute Hooklength Long Leaders
different
Absolute Hooklength Box - Long
Long box for rigs
Designed to accommodate rigs ranging in length from 4” (10 cm) to 12” (30 cm), this box offers plenty of storage space while maintaining a compact profile.
The Absolute leader boxes are constructed with a durable, reinforced shell that is closed with magnets to ensure water resistance.
A huge range of internal pegs allows you to use this box to store rigs for all kinds of methods, from pole to feeder.
• Slim profile
• Durable construction
• 10 pins to fit all hook designs
• Waterproof seal
Dimensions: 33x9x2,5 cm
Review photos
- Condition: New
- Brand: Preston
- EAN (GTIN): 5056317726183
- Manufacturer code: P0220123
- Model: Absolute Hooklength Box - Long
Marketing Authorisation Holder (Manufacturer): BV Preston Innovations Europe Dennenlaan 3A City: 2340 Beerse Belgium compliance-europe@ratheroutdoors.com GPSR compliant data
Specifications
| Group | Name | Value |
|---|---|---|
| Parametry | Condition | new |
| Parametry | Invoice | With VAT invoice |
| Parametry | Brand | Preston |
| Parametry | Manufacturer code | P0220123 |
| Parametry | Model | Absolute Hooklength Boxes |
| Parametry | Product weight with unit packaging | 0.1 kg |
| Parametry | Kind | box |
| Parametry | Color | silver |


